The existing barn had no concrete foundation, so SSB first installed temporary supports for all the posts, then dug footings and poured a new foundation and curb around the perimeter. Then we built temporary supports for the interior columns and poured new concrete piers. We finished the concrete work by installing a new 6” slab on the inside.

Once the floor was completed, we framed in an office, break room, oil room, and vehicle storage room, with fully insulated walls and ceiling. We re-attached the building’s existing corrugated metal roof and applied a full roof coating for long-lasting protection and energy savings.